Waterdon has completed a total of 4 phases of the structural and membrane repairs for Carleton University’s P9 parking garage. These repairs have consisted of everything from:
- Carbon fiber structural plates are installed on structural concrete beams to increase the rigidity of the structure
 - Reinforcing existing concrete beams with cast-in-place beam jackets
 - Structural steel upgrades to reinforce the structure
 - Temporary shoring of the structure when steel tendons were reported corroded
 - Concrete column repairs
 - Vertical and horizontal concrete repairs
 - Traffic membrane removal and installations
 - Door and frame replacement
 - Stair and tread replacements