Project Title: Carleton University Parking Garage
Location: Ottawa, Ontario
Sectors: Institutional
Waterdon has completed a total of 4 phases of the structural and membrane repairs for Carleton University’s P9 parking garage. These repairs have consisted of everything from:
- Carbon fiber structural plates are installed on structural concrete beams to increase the rigidity of the structure
- Reinforcing existing concrete beams with cast-in-place beam jackets
- Structural steel upgrades to reinforce the structure
- Temporary shoring of the structure when steel tendons were reported corroded
- Concrete column repairs
- Vertical and horizontal concrete repairs
- Traffic membrane removal and installations
- Door and frame replacement
- Stair and tread replacements